Preparaing to install the refrigrator, Installation refrigerator instructions, Important – GE 200D8074P043 User Manual

Page 23

Advertising
background image

BEFORE YOU BEGIN

Read these instructions completely
and carefully.

•

IMPORTANT

—

Save these

instructions for local inspector’s use.

•

IMPORTANT

—

Observe all

governing codes and ordinances.

• Note to Installer – Be sure to leave these

instructions with the Consumer.

• Note to Consumer – Keep these

instructions for future reference.

• Skill level – Installation of this appliance

requires basic mechanical skills.

• Completion time – Refrigerator Installation

30 minutes
Water Line Installation

30 minutes

• Proper installation is the responsibility of

the installer.

• Product failure due to improper installation

is not covered under the Warranty.

If the refrigerator has already been installed,
remove the base grille (see Step 2 in

Moving

the Refrigerator

), then skip to Step 5 in

Installing the Refrigerator

.

Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: GEAppliances.com

In Canada, call 1.800.561.3344 or Visit our Website at: geappliances.ca

Installation

Refrigerator

Instructions

Models 23, 25, 26, 27 & 29

If the refrigerator has an icemaker, it will have

to be connected to a cold water line. A GE

water supply kit (containing tubing, shutoff

valve, fittings and instructions) is available at

extra cost from your dealer, by visiting our

Website at GEAppliances.com (in Canada at
geappliances.ca

) or from Parts and

Accessories, 800.626.2002 (in Canada

1.800.661.1616).

PREPARATION

WATER SUPPLY TO THE ICEMAKER

TOOLS YOU WILL NEED

23

Phillips Head Screwdriver

3/8” and 5/16” Socket

1/2” and 7/16” Wrench

Plastic Putty Knife

1/8” Hex Wrench

Advertising
This manual is related to the following products: