GE EZ2 Series User Manual

Page 20

Advertising
background image

16

REMEDIES

Refer to Section 2.9 for proper-

ly setting concentrate and

recycle valves

See above.

Check the water temperature.

If needed, install a hot/cold
tempering valve. Permeate

production rate is dependent on

77°F (25°C). Refer to Section

2.5 (Temperature Correction

Factor).

Refer to Section 2.18 for cor-

rect membrane element

installation procedure.

Membrane elements with

damaged brine seals may be

returned for repair. For low

permeate production, it is

wise to test the permeate pro-

duction of each membrane

element.

Refer to Section 2.18 for cor-

rect membrane element

installation.

Flush and/or clean the

machine.

Reduce permeate line back-
pressure. Check for restric-

tions in permeate plumbing.

POSSIBLE CAUSES

Concentrate or recycle valve to

far open

Low operating pressure

Machine operating on cold

water

Membrane elements installed

incorrectly

Brine seal has “rolled” or been

damaged

Dirty or fouled membrane

elements

Backpressure on the permeate

line

PROBLEM

Low operating pressure

(continued)

Low permeate production

.

T R O U B L E S H O O T I N G G U I D E

Advertising
This manual is related to the following products: