Installation instructions – GE 200D8074P036 User Manual

Page 23

Advertising
background image

23

Installation Instructions

REPLACE THE BASE GRILLE

Replace the grille by installing the two Phillips
head screws.

7

SET THE CONTROLS

Set the controls to the recommended setting.

8

START THE ICEMAKER

Set the icemaker power switch to the I (on)
position. The icemaker will not begin to operate
until it reaches its operating temperature of
15°F (–9°C) or below. It will then begin operation
automatically. It will take 2–3 days to fill
the ice bin.

NOTE:

In lower water pressure conditions, the water
valve may turn on up to 3 times to deliver
enough water to the icemaker.

9

Power
switch

Advertising