Generac QT 5.4L User Manual

Page 22

Advertising
background image

Maintenance Level 1

Level 2

Level 3

Level 4

Level5

Tasks

Recom-

Task Required Task Required Task

Task Required Task

mended

Comp. to be done Comp. to be done Comp.

Required

Comp. to be done Comp.

to be done (Date- 3 months/ (Date-

Semi-

(Date- to be done (Date-

Bi-

(Date-

monthly/ Initials) Break-in Initials) annually/ Initials) Annually/ Initials) annually/ Initials)

10 hrs.

30 hrs.

50 hrs.

100 hrs.

250 hrs.

1.

Disable the unit
from operating
per the first page

warning.

2.

Check the engine
oil level. Adjust
as necessary.

3.

Check the engine
coolant level.
Adjust as
necessary.

4.

Check the engine
coolant thermal
protection level.
Correct as
necessary.

5.

Check the natural
gas delivery
system for leaks
and correct
pressure on gas
engine driven
units. Tighten
connections as
necessary.

6.

Check the air
inlets and outlets
for debris. Clean
as necessary.

7.

Check the battery
electrolyte level
and specific
gravity if
accessible. Adjust
as necessary.

8.

Check the battery
posts, cables,
and charger for
loose
connections,
corrosion, and
proper operation.
Correct as
necessary.

9.

Check the unit
wiring for loose
connections,
corrosion, and
damage. Correct
as necessary.

11-2

Standby Generator Sets

Service Schedule

SrvSchd001 Re

v. A 09/05

Advertising