12. connecting input power, Important – Miller Electric SRH-503 User Manual

Page 21

Advertising
background image

OM-2236 Page 17

4-12. Connecting Input Power

800 103-C / Ref. 801 116-A

3/8 in

3/8 in

Tools Needed:

Y

Installation must meet all National
and Local Codes − have only quali-
fied persons make this installation.

Y

Disconnect and lockout/tagout in-
put power before connecting input
conductors from unit.

Y

Make input power connections to
the welding power source first.

Y

Always connect green or green/
yellow conductor to supply
grounding terminal first, and never
to a line terminal.

See rating label on unit and check input
voltage available at site.

1

Input Power Conductors (Customer
Supplied Cord)

Select size and length of conductors using
Section 4-10. Conductors must comply
with national, state, and local electrical
codes. If applicable, use lugs of proper
amperage capacity and correct hole size.

Welding Power Source Input Power
Connections

2

Strain Relief

Route conductors (cord) through strain re-
lief and tighten screws.

3

Machine Grounding Terminal

4

Green Or Green/Yellow Grounding
Conductor

Connect green or green/yellow grounding
conductor to welding power source
grounding terminal first.

5

Welding Power Source Line
Terminals

6

Input Conductors L1 (U), L2 (V) And
L3 (W)

Connect input conductors L1 (U), L2 (V)
and L3 (W) to welding power source line
terminals.

Close and secure access door on welding
power source.

Disconnect Device Input Power Con-
nections

7

Disconnect Device (switch shown in
OFF position)

8

Disconnect Device (Supply)
Grounding Terminal

Connect green or green/yellow grounding
conductor to disconnect device grounding
terminal first.

9

Disconnect Device Line Terminals

Connect input conductors L1 (U), L2 (V)
And L3 (W) to disconnect device line
terminals.

10 Over-Current Protection

Select type and size of over-current
protection using Section 4-10 (fused dis-
connect switch shown).

Close and secure door on line disconnect
device. Remove lockout/tagout device,
and place switch in the On position.

IMPORTANT

GND/

3

PE Earth Ground

Input Contactor

L1 (U)

L2 (V)

L3 (W)

= GND/PE Earth Ground

7

2

10

5

3

6

4

8

4

9

1

=

6

3

Advertising