Setup – Marantz LN-11S1A User Manual

Page 12

Advertising
background image

8

B

EF

O

RE

U

SE

N

A

M

E O

F P

A

RT

S

B

A

SIC

O

PE

RA

TIO

N

A

D

VA

N

CE

D

O

PE

RA

TIO

N

REM

OT

E C

ON

TR

OLL

ER

OP

ER

ATI

ON

TR

OU

BLE

SH

OO

TIN

G

O

TH

ER

S

SE

TU

P

SETUP

3.

Install the combined Plates #1 and #2 (or

Plate 1 with the EXT10) securely to the
Building Structure following all of the
Local Building/Construction Codes. Use

suitable hardware in adequate quantity
and size depending on the installation
requirements.

Figure 11

Figure 12

Plate #3

EXT10

Plate #1

Caution:

The Projector together with the mounting brackets

weighs 59 pounds (26.7kg).

4.

Attach the Horizontal Tilting Plate #3 to

the previously combined plates (already
installed on ceiling) using the 1/4-20 inch
screws provided. Refer to Figures ?? and ??.
Install two 1/4-20inch screws with rubber
spacers and metal washers part way into
the welded metal studs (indicated #1).

The newly combined Plate 3 provides 10
degrees of horizontal tilt. After positioning
the plate, loosely tighten the screws.

Figure 13

Note:

When the EXT10 Extension Pole will be used, attach

the “Inner Pole” end to combined Plate #2 and #3

(instead of Plate #2) using four (4) 5/16-18 inch

nuts and washers provided. Refer to Figure 13.

Wire

Access

5.

Tighten all the recently install hardware

and proceed to install the LN-11S1A.

Figure 14

Titing Capability

Titing Capability

Figure 15

Advertising