Assembly – Maytag MBV1976AA User Manual

Page 8

Advertising
background image

7

SkyBox™ Personal Beverage
Vendor Top and Door
Assembly

(Select Packaging Only)

Carefully unpack the SkyBox™ personal beverage
vendor from the packaging.

If needed, follow these instructions for attaching the
door to the main unit of your SkyBox™ personal
beverage vendor.

Parts

Quantity

Top Cover .........................................1
Main Unit .........................................1
Door ...................................................1
Door Wire Harness.......................1

STEP 1 – Attach Top Cover

• Slide hooks at front of top panel into slots at front of

main unit.

• Press top cover down in back so 3 tabs snap

securely into place onto back of main unit.

Assembly

STEP 2 – Attach Door

• Align hinges of door to hinge

posts on the main unit. Hold
door at an angle (greater
than 90°)
from the main unit
opening. (Note: For your safety,
the door will not attach or
detach at a 90° angle.)

• Slide hinges down onto hinge

posts. Door will slide on easily.
DO NOT FORCE.

STEP 3 – Attach Door Wire Harness

• Attach one end of door wire harness to plug-in on

lower left corner of main unit opening, aligning plug
with small tab facing up to fit plug-in. Note: plug will
only fit one direction. DO NOT FORCE.

• Attach other end of door wire harness to plug-in on

lower right corner of door, aligning plug with small
tab facing up to fit plug-in. Note: plug will only fit
one direction. DO NOT FORCE.

Advertising