Warning, Avertissement – Maxon Telecom MPB3328CNE User Manual

Page 19

Advertising
background image

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

19

GAS CONVERSION KITS

In Canada:
THE CONVERSION SHALL BE CARRIED OUT
IN ACCORDANCE WITH THE REQUIREMENTS
OF THE PROVINCIAL AUTHORITIES HAVING
JURISDICTION AND IN ACCORDANCE WITH
THE REQUIREMENTS OF THE CAN1-B149.1
AND .2 INSTALLATION CODE.

LA CONVERSION DEVRA ÊTRE EFFECTUÉE
CONFORMÉMENT AUX RECOMMANDA-
TIONS DES AUTORITÉS PROVINCIALES
AYANT JURIDICTION ET CONFORMÉMENT
AUX EXIGENCES DU CODE D'INSTALLATION
CAN1-B149.1 ET.2.

Gas conversion kits are available to adapt the
appliance from the use of one type of gas to
the use of another. These kits contain all the
necessary components needed to complete the
task including labeling that must be affi xed to
ensure safe operation.

Kit part numbers are listed here and the following
steps detail the conversion procedure.

Step 1. Turn off the gas supply to the appliance.
Remove the front glass door/frame from the
appliance. Access the control compartment.

Step 2. Carefully remove the logs. Exercise
care so as not to break the logs.

Step 3. Locate the screws securing the burner
assembly to the appliance. Remove the burner
assembly and retain the securing screws.

Millivolt SIT Systems

Propane to Natural Gas

Conversion Kits

Models

Cat. No.

MPB-3328

19M43

MPB-3530

H2012

MPB-4035

H2014

MPB-4540

H2016

Millivolt SIT Systems

Natural Gas To Propane Gas

Conversion Kits

Models

Cat. No.

MPB-3328

H2009

MPB-3530

H2011

MPB-4035

H2013

MPB-4540

H2015

Electronic HONEYWELL Systems

Natural Gas To Propane Gas

Conversion Kits

Models

Cat. No.

MPB-3328

26M59

MPB-3530

26M60

MPB-4035

26M61

MPB-4540

26M62

Electronic HONEYWELL Systems

Propane Gas To Natural Gas

Conversion Kits

Models

Cat. No.

MPB-3328

19M45

MPB-3530

26M64

MPB-4035

26M65

MPB-4540

26M66

WARNING

This conversion kit shall be installed by a qualifi ed
service agency in accordance with the manufacturer's
instructions and all applicable codes and require-
ments of the authority having jurisdiction. If the
information in these instructions is not followed
exactly, a fi re, explosion or production of carbon
monoxide may result causing property damage,
personal injury or loss of life. The installation is
not proper and complete until the operation of the
converted appliance is checked as specifi ed in the
owner instructions supplied with the kit.

The qualifi ed service agency performing this instal-
lation assumes responsibility for this conversion.

AVERTISSEMENT

Cet Équipement de conversion sera installÉ par
une agence qualifi Ée de service conformÉment aux
instructions du fabricant et toutes exigences et codes
applicables de l’autorisÉs avoir la juridiction. Si
l’information dans cette Instruction n’est pas suivie
exactement, un feu, explosion ou production de
protoxyde de carbone peut rÉsulter le dommages
causer de propriÉtÉ, perte ou blessure personnelle de
vie. L’agence qualifi Ée de service est esponsable de
l’installation propre de cet Équipment. L’installation
n’est pas propre et complÉte jusqu’à l’opÉration de
l’appareil converti est chÉque suivant les critères
Établis dans les instructions de propriÉtaire provi-
sionnÉes avec l’Équipement.

Figure 39

Step 4. Millivolt Appliances - SIT Systems

a. Refer to Figure 39 and the instructions pro-
vided with the kit. Using a Torx T20, remove and
discard the three pressure regulator mounting
screws. Remove the pressure regulator, spring,
poppet, diaphragm and bushing. Discard all
removed components. Ensure the rubber
gasket installed on the back of the replacement
pressure regulator is properly positioned and
install the new pressure regulator using the new
screws supplied with the kit. Tighten screws
to 25 In. lb. torque.

SIT Millivolt Gas Valve

Pressure

Regulator

Remove
These
Components

Advertising