Sequence of operation, 4. sequence of operation – Miller Electric pmn User Manual

Page 22

Advertising
background image

OM-228 305 Page 18

out bottom of cut.

Ref. 802 878

5-4. Sequence Of Operation

After cutting arc starts, slowly

start moving torch across metal.

Adjust torch speed so

sparks go thru metal and

Pause briefly at end of

cut before releasing trigger.

EXAMPLE Of Cutting Operation

Raise trigger lock and press

trigger. Pilot arc starts.

Postflow continues for 20 seconds after

releasing trigger; cutting arc can be instantly

restarted during postflow by raising trigger

lock and pressing trigger.

!

The pilot arc starts immediately when trigger is pressed.

Place tip on work for drag cutting or for

maximum cutting speed and tip life, use a

standoff distance of 1/16 in (1.6 mm) to 1/8

in (3.2 mm) (dragging tip will reduce tip life).

Advertising