Process validation 50, Routine checks 50, Maintenance – Miele G 7823 User Manual

Page 50: Process validation, Routine checks

Advertising
background image

Process validation

The standard of cleaning and
disinfection in the disinfection
programmes must be confirmed by the
user as a routine matter.
Safety checks must be carried out to
the machine every 3 months by a Miele
approved service technician in
accordance with EN ISO 15883 and
HTM 2030.

Routine checks

Before the start of each working day the
user must carry out a number of routine
checks. A check list is supplied with the
machine for this purpose.

The following need to be inspected:

– All filters in the wash cabinet

– The spray arms in the machine and

in any mobile units or modules

– The wash cabinet and the door seal

– Mobile units, modules and inserts

Maintenance

50

Advertising
This manual is related to the following products: