Location of ice machine, Leveling the ice storage bin – Manitowoc Ice Q 800 User Manual

Page 8

Advertising
background image

Installation Instructions Section 2

2-2

Location of Ice Machine

The location selected for the ice machine must meet
the following criteria. If any of these criteria are not
met, select another location.

• The location must be free of airborne and other

contaminants.

• The air temperature must be at least 35°F (1.6°C),

but must not exceed 110

°F (43.4°C).

• The location must not be near heat-generating

equipment or in direct sunlight.

• The location must not obstruct air flow through or

around the ice machine. Refer to the chart below
for clearance requirements.

Water-Cooled

Top/Sides 5”

(127

mm)*

Back 5”

(127

mm)*

*There is no minimum clearance required. This value
is recommended for efficient operation and servicing
only.

Leveling the Ice Storage Bin

1. Screw the leveling legs onto the bottom of the

bin.

2. Screw the foot of each leg in as far as possible.

CAUTION

The legs must be screwed in tightly to prevent
them from bending.


3. Move the bin into its final position.
4. Level the bin to assure that the bin door closes

and seals properly. Use a level on top of the bin.
Turn each foot as necessary to level the bin.

5. Inspect bin gasket prior to ice machine

installation. (Manitowoc bins come with a closed
cell foam gasket installed along the top surface of
the bin.)

6. Install ice machine on bin.

NOTE: An optional caster assembly is available for
use in place of the legs. Installation instructions are
supplied with the casters.

THREAD

LEVELING LEG

INTO BASE OF

CABINET

THREAD “FOOT”

IN AS FAR AS

POSSIBLE

SV1606

Leveling Leg and Foot

Advertising