Installing and aligning wire guide and drive rolls – Miller Electric UWF-SC12RC User Manual

Page 13

Advertising
background image

OM-215 092 Page 9

3-6.

Installing And Aligning Wire Guide And Drive Rolls

804 210-A

Installing Wire Guide And Drive
Rolls:

1

Drive Roll Nut

2

Drive Roll Carrier

Turn nut one click until lobes of nut
line up with lobes of drive roll carrier.

3

Drive Roll

Slide drive roll onto drive roll carrier.
Turn nut one click.

Repeat procedure for top drive roll.

4

Inlet Wire Guide Screw

5

Inlet Wire Guide

Loosen securing screw. Install inlet
guide so inlet guide screw is
centered in groove in guide, or so tip
is as close to drive rolls as possible
without touching. Tighten screw.

Aligning Wire Guide And Drive
Rolls:

View is from top of drive rolls look-
ing down with pressure assembly
open.

6

Drive Roll Securing Nut

7

Drive Roll

8

Wire Guide

9

Welding Wire

10 Drive Gear

Turn screw in or out until drive roll
groove lines up with wire guide.

Close pressure roll assembly.

Only bottom drive roll alignment is
adjustable. Turn adjustment screw
in or out until groove in drive roll
lines up with wire guide as shown.

Cleaning Drive Rolls:

Remove drive rolls, and clean
grooves using a wire brush.

Tools Needed:

3/16 in

Aligning Wire Guide And Drive Rolls

Correct

Incorrect

8

7

6

10

3/8 in

2

3

4

5

Installing Wire Guide

And Drive Rolls

9

1

Advertising