Propane only, Front cabinet support installation, Heat shield installation – Interlink electronic L485SIB User Manual

Page 20

Advertising
background image

20

www.ultrachefgrills.com

7. Front Cabinet Support Installation

Fasten top rail assembly to the front of side panels using (4) #14 x 1/2” screws. For ease of installation start all screws
before tightening completely. Snap magnet into place as shown.

8. Heat Shield Installation

Attach heat shield above propane tank ring using (4) #14 x 1/2» screws. Attach one end under lip of back panel and other
end to underside of front cabinet support.

6. Tank Inhibitor Bracket / Propane Tank Mount Installation

Insert tank inhibitor bracket into slot in rear panel as illustrated. Fasten to bottom panel using (1) #14 x 1/2” screw. Clip top
propane tank mount into slots in back panel. Insert one end at a time, gently bending wire. (When not in use tank mount
will lay flat against back panel).

Propane Only

1 x N570-0080 (#14 x 1/2”)

3/8”(10mm)

Advertising
This manual is related to the following products: