ICI - Innovative Creations, Inc. AX User Manual
Page 13
 
MAINTENANCE
11
5 MAINTENANCE
5.1 ORDINARY
• Periodically purge the level gauges, probe holder if fitted and the boiler, to avoid the accumulation of
sludge;
• Check the efficiency of the control and regulation instruments, examining carefully the electrical parts
(connections included) and the mechanical parts (pressure switches); it is advisable to replace every 
year the ceramic probe-holders; 
•
Carry out burner maintenance (as to the specific instructions);
•
Check the tightness of flange bolts and the state of the gaskets;
•
Check the conditions of the boiler door internal covering;
•
Clean the flue-gas tube bundle and the turbolators;
•
Carry out correct maintenance to the pump (bearings, mechanical seal),
• Check for wear to the discharge valves; these tend to wear more quickly, due to the abrasive effect of
the sludge during blow-down.
 
 
5.2 PERIODIC
5.2.1 Periodic control (every 6 hours of use)
 
From time to time (every 6 hours of use) the thermal plant must be inspected by qualified personnel to check 
the efficiency of all safety accessories: 
 
• 
Safety pressure switch
 
• 
Water level limits
 
The system can be reset if no anomalies have been encountered: power off the panel for approx. 20 
seconds, power on the main switch and press the reset buttons. 
 
For further details follow the flow chart below: