Operation – John Deere AC-155LP User Manual

Page 13

Advertising
background image

Operator’s Manual

13

Operation

OPERATION

5. Plug extension cord into a 120 volt/60 hertz, 3-hole,

grounded outlet.

6. Open propane supply valve on Propane / L.P. tank(s)

slowly.

Note: If not opened slowly, excess-flow check valve on

Propane / L.P. tank will stop gas flow. You may hear a click

from the excess-flow check valve closing. If this

happens, reset the excess-flow check valve by closing

propane supply valve and open again slowly.

7. Turn thermostat control knob fully counterclockwise to

the "cooler" position. Turn ON/OFF switch to the ON

position. Turn thermostat control knob slowly clockwise

until electric motor and fan begin to run. Heater will start

in approximately 3 seconds. Adjust thermostat control

knob to warmer or cooler setting as needed.

Note: If heater does not start after 3 seconds, the ignition

control will automatically attempt to start heater one time.

If heater fails to start on this attempt, the safety control

will "lock out" and no further automatic restarts will be

attempted. This could occur if air remains in fuel line. If

heater fails to start on this attempt, turn ON/OFF switch

to OFF position. Wait ten seconds for safety control to

reset, then turn ON/OFF switch back to ON position and

try to start heater again.

8.

Thermostat Operation Only: During normal thermostat

operation, heater will cycle off when air temperature

rises to thermostat setting. When air temperature drops

sufficiently below thermostat setting, the electric motor

and fan will begin to run. After 15 to 60 seconds, heater

burner should automatically ignite and provide heat to

maintain temperature setting.

STOP SPACE HEATER:

1. Tightly close propane supply valve on Propane / L.P.

tank(s).

2. Wait a few seconds. Heater will burn gas left in supply

hoses.

3. Turn ON/OFF switch to the OFF position.
4. Unplug heater.

Advertising