Important, Side view – Spalding M881119 User Manual

Page 13

Advertising
background image

12/05

ID# M881111

13

4

3

Fill hole completely with concrete.

6.

1" (2.54 cm)

1" (2.54 cm)

1" (2.54 cm)

5

GSLV09.EPS

211121

1" (2.54 cm)

7.

Tamp down concrete to release air pockets and build drainage hill. Level pole section in all
directions several times while concrete is curing.

1" (2.54 cm)

1" (2.54 cm)

1" (2.54 cm)

SIDE VIEW

Make a reference

mark here for anti-

skid tape.

NOTE:

DRAINAGE

HILL

IMPORTANT!

CONTINUE ON TO NEXT STEP. DO NOT WAIT FOR CONCRETE TO CURE.

Keep flange pushed

down to concrete

and leveled.

NOTE:

IMPORTANT!

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

PLAYING SURFACE

Advertising
This manual is related to the following products: