Important – Spalding M881119 User Manual

Page 29

Advertising
background image

12/05

ID# M881111

29

Fill pole with concrete approximately 1” (2.54
cm) below bottom elevator hole as shown.

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

1

9.

IMPORTANT!:

FAILURE TO FILL YOUR
POLE COMPLETELY
WITH CONCRETE AS
DESCRIBED IN THESE
INSTRUCTIONS WILL
VOID ALL WARRANTIES
WRITTEN AND IMPLIED.

IMPORTANT!:

Make sure that
concrete does not bulge
from the end of pole
assembly. Allow
concrete to completely
cure.

10.

Install net (34).

B.

D.

C.

A.

34

34

Advertising
This manual is related to the following products: