Checking and Testing Operations

C

OMPLETING THE

I

NSTALLATION

To complete the installation, perform the following checks and tests
to ensure that the air conditioner is operating correctly.

1

Review all the following elements in the installation:

Installation site strength

Piping connection tightness to detect any gas leakages

Connection wiring

Heat-resistant insulation of the piping

Drainage

Earthing wire connection

Correct operations (follow the steps below)

2

Press the On/Off button.

Result:

The indicator lights on the indoor unit flash at
half-second intervals.

While the indoor unit opens, the indoor unit fan runs

to start.

3

Press the button.

Result:

The outdoor unit operates in cooling mode as
following the room temperature.

4

Air flow direction

Press the button and check that the air

flow blades work properly.