Standard installation: back-to-back installation – KWC MARLINO 802 141 User Manual

Page 2

Advertising
background image

1/2" FPT

1/2" FPT

1/2" FPT

1/2" FPT

1/2" FPT

1/2" FPT

Inlet:
hot
water

Inlet:
cold
water

Inlet:
hot
water

Inlet:
cold
water

Inlet:
hot
water

Inlet:
cold
water

!

!

!

MIN

IMU

M

MAX

IMU

M

MINIMUM

MAXIMUM

K.37.P4.02

K.37.P4.01

MIN

IMU

M

MAX

IMU

M

MIN

IMU

M

MAX

IMU

M

MIN

IMU

M

MA

XIM

UM

K.37.P4.03

MIN

IMU

M

MAX

IMU

M

102mm

4"

39mm / 1 17/32"

67mm

2 5/8"

70mm

2 3/4"

70mm

2 3/4"

86mm

3 3/8"

180mm / 7 1/8"

179mm / 7 1/32"

96mm / 3 25/32"

180mm / 7 1/8"

81mm /
3 3/16"

100mm /
3 15/16"

58mm / 2 9/32"

39mm / 1 17/32"

58mm / 2 9/32"

1150mm

45"

1980mm

78"

840mm

33"

810mm

32"

Shower only

Tub / shower

Floor

line

1170mm

46"

179mm / 7 1/32"

96mm / 3 25/32"

Standard installation:

Back-to-back installation:

!

140mm /
5 1/2"

+

/

1

2

Rough in

Standard installation

Back-to-back installation

Dimensions

Back-to-back installation:
In back-to-back installations, cartridge must be
rotated 180° to ensure proper valve operation.

3 port valve, shower only:
Position valve with outlet up. Finished wall must be within the
dimensions shown on finished wall template.

4 port valve, tub and shower:
Position valve with shower outlet marked "S" up and the tub outlet
marked "T" down.
Finished wall must be within the dimensions shown on finished wall
template.

Finished wall template must remain intact for finished
wall surface measurements and as a template for
plastering and / or tiling.

It is not necessary to remove the pressure balancing
cartridge from the valve during normal soldering of
connections, using propane-butane gas. Do not use
OXYGEN-ACETYLENE!

When soldering connections, do not use excessive
heat!
To test the pipe joints, pressurize both hot and cold
inlets!

Advertising