KVH Industries TracVision 4 User Manual

Page 33

Advertising
background image

Connecting a PC to the Switchplate’s Maintenance Port

To install satellites, you first need to connect a PC to the
switchplate’s maintenance port. This procedure requires
Windows Hyperterminal (or other terminal emulation software,
such as PROCOMM). Use the settings appropriate to your
application and follow the steps below.

1. Connect one end of the PC data cable to the DB9

connector on the switchplate. Connect the other
end to the serial port on your PC (a 9-pin/25-pin
connector adapter may be needed for some PCs).

2. Open the terminal emulation software and

establish the following settings:

• Bits per second: 9600

• Data bits: 8

• Parity: None

• Stop bits: 1

• Flow control: None

3. Apply power to the TracVision 4 system and allow

the system to complete full initialization. Data
should be scrolling on the PC display to identify
any system problems detected. If no data is seen,
recheck your connections and the terminal
software setup for the correct COM port.

Are the Satellites You Want to Track Listed in the Library?

If the satellites you want to track are listed in the library, skip to
“Installing Your Satellites” on page 35.

If you want to track a satellite that is not listed in the library,
follow the steps in the next section, “Programming User-defined
Satellites.”

Installation

54-0150

29

Antenna

On/Off Switch

Maintenance

Port

Figure 2-17
Switchplate Front Panel

Advertising