La Crosse Technology WS-7213U User Manual

Page 18

Advertising
background image

18

monitor the temperature via a probe for
use in pools, spas, etc and the TX4U will
monitor temperature and humidity.

Note: When setting up multiple units it
is important to remove the batteries from
all existing units in operation, then to
insert batteries first into all the remote
sensor units, and in numeric sequence.
Second, install batteries into the indoor
weather station. Transmission problems
will arise if this is not done correctly and
if the total time for set-up exceeds 6
minutes.

1.

It is necessary to remove the batteries

from all units currently in operation.

2.

Remove the battery covers to all

remote sensor units.

3.

Place all remote sensor units in a

numeric sequential order.

4.

In sequential order, install batteries

(follow the same battery installation

Advertising