Lennox Hearth PERFORMER SWS210 User Manual

Page 14

Advertising
background image

14

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

1. Check that all chimney pipe joints are securely fastened.

2. Check that the heater is securely fastened to the floor (if ap-

plicable).

3. Make sure the intake vent has clear access to outside air (if ap-

plicable).

4. Make sure the outside air vent has been sealed properly to keep

rodents out (if applicable).

5. Be sure all roof flashings are watertight.

6. Be sure the stove is properly grounded (if applicable).

FOR YOUR OWN PROTECTION AND INSURANCE PURPOSES,

HAVE YOUR CHIMNEY AND CONNECTOR PIPE INSTALLATION

INSPECTED BY YOUR LOCAL BUILDING CODE AUTHORITY OR

FIRE MARSHAL BEFORE STARTING A FIRE IN YOUR STOVE.

NOTIFY YOUR INSURANCE COMPANY.

CAUTION: Wear gloves during brick installation in case of

sharp edges inside the stove.

Note: Installation of the baffle boards and baffle blankets are easier when

you can still access the flue outlet, (before connecting the flue vent). Be

sure the baffle blankets are placed flat on the baffle boards so as not

to block exhaust flow to the flue. Use a ruler or a piece of kindling to

reach over the baffle blanket to be sure it is completely flat on top of the

baffle boards.

Measure bricks before installing, as per list of dimensions on next

page, to be sure the correct bricks are installed in the correct location.

1. Install bricks #1-26 in the numbered sequence shown in Figure

14 on Page 15.

Note: Before installing your baffle boards make sure the stainless

steel tube support and front and rear tube hangers are centered

side to side and that the front and rear hangers are hooked onto

the stainless steel pins protruding from the rear of the airwash

and the stove back.

2. Next, you will install the baffle boards. All 4 baffle boards included

are the same size. You will start by installing the boards in the

center part of the unit on top of the secondary tubes to each side

of the baffle support with the 15” side of the baffle board going

from the front to back of the unit. Once you have the first two

boards installed slide the board to the left side of the baffle sup-

port all the way to the left and rear of the unit. You will slide the

board to the right side of the secondary support to the right and

rear of the unit. Next you will install the two remaining boards

where you originally installed the first two boards on each side

of the baffle support and pushed against the rear of the unit. The

stainless steel support hanger should be centered left to right

between the sets of baffle boards and placed as shown in Figure

15 on Page 15.

POST INSTALLATION CHECKS

BRICK INSTALLATION

Advertising
This manual is related to the following products: