Voltage Programming Procedure

21

9.0

V

OLTAGE

P

ROGRAMMING

P

ROCEDURE

Figure 18 Load Level Indicators

1. Remove the front bezel from the UPS.
2. UPS must be operating in Normal (AC) mode.

3. The AC Input, Load, and Battery Level Indicators should be lit.
4. Press the Voltage Programming button for at least 5 seconds to enter the Configuration mode.

The UPS will beep and all of the indicators on the front panel display will flash on and off for

about 5 seconds. The next cycle will display the current configuration, either 110, 120 or 127 VAC.

One of the Load Level Indicators will be flashing. Initially, the 0%-25% Load Level Indicator will

be flashing, indicating the default setting of 120V as shown in Figure 18.

5. Press the ON button to step through the voltage settings until the appropriate Load Level

Indicator is flashing.

6. Press the Voltage Programming button. The UPS will return to Normal mode operation.
The Voltage Programming button allows the operator to select the utility transfer voltage at which

the UPS will switch to battery power. This also changes the inverter voltages. The voltage settings

are as follows:

NOTE
Utility power will be applied to the connected load.

Setting

Input Voltage

Range

Output Voltage

(Battery Mode)

120V (230V)

85 - 145 VAC

(default)

120VAC

110V (220V)

78 - 138 VAC

110VAC

127V (240V)

90 - 150 VAC

127VAC

Load Level

Indicators