Step 12. feed upper cable, continued g – Precor Strength-Training S3.25 User Manual

Page 25

Advertising
background image

S3.25 Assembly and Maintenance Guide

page 25

1

2

3

4

5

6

G. Insert the Selector Stem in the Weight Stack with

the threaded hole at the top. Hold the Selector
Stem with several holes above the Cap Plate.
Insert the Weight Pin to suspend the Selector
Stem. Place the loop end of the Weight Pin
Lanyard into the U end of the Cable. Align the U
end of the Cable, the top of the Selector Stem, and
the Cap Plate. Attach using
one 1½-inch socket cap bolt

H. Wrench tighten. Remove the Weight Pin and lower

the cap plate.

Step 12. Feed Upper Cable, Continued

G

1 - 1½" socket cap bolt

Guide Rods

Cap Plate

Weight Pin

Selector Stem

Cable 44370-103

Advertising