PB Heat 211A User Manual

Page 38

Advertising
background image

36

INSTALL CONTROLS AND TRIM

Figure 8.6: Optional Feeder/Low Water Cut-Off, Type 51-2

APPLICATION OF 51 FEEDERS

Models 211A-24 thru 211A-39

One 51-S-2 Feeder/Cutoff

Models 211A-40 and Larger

Two 51-2 Feeder/Cutoffs

Consult Factory for proper application of feeders.
Always use a pump control and boiler feed system
instead when possible.

Normal Water Line

Feeder Closing Level
(Mark on Casting)

2" (51 mm)

3/4"

19 mm)

(

12-7/8"

327 mm)

(

6-11/16"

170 mm

(

)

25-1/8" (

638 mm)

Boiler Foundation

10-3/8"

264 mm)(

10-7/8" (

276 mm)

36" (914 mm )

4-1/8"

105 mm

(

)

8-1/8"

206 mm)

(

Install 1" Blowoff Valve

Burner Cut-Off Level is

(

) Below

Center Line on 51-2 and 51-S-2 Controls

[

(

) Below Normal Water Line]

1-1/2" 38 mm

2-3/4" 70 mm

Control Center Line

The connected fittings shown on this
drawing are to be supplied by the installer.

J

F

A

A

A

B

B

D

D

D

C

C

C

C

C

G

H

E

Models 211A-04 thru 211A-23

One 51-2 Feeder/Cutoff

SUGGESTED FITTINGS LIST

A

B

C

D

E

F

G

H

J

1" Cross

1" Ground Joint Union

1" Plug

1" x

(

) long Nipple

1" x

(

) long Nipple

1" x

(

) long Nipple

1" x

(

) long Nipple

1" x

(

) long Nipple

3" x 1" Bushing

3" 76 mm

5-1/2" 140 mm

8" 203 mm

8-1/4" 210 mm

19-1/2" 495 mm

40-1/2"

(1029 mm)

Advertising