Figure 45, Figure 46 – ParaBody 425103 User Manual

Page 38

Advertising
background image

• If upon completion of assembly, the HEAD PLATE (72) does not

sit on top of the first WEIGHT PLATE (105), push the HEAD
PLATE (72) down, insert the WEIGHT STACK PIN (75) and
perform several repetitions at the press station. This will relax the
cable system and prevent the HEAD PLATE (72) from lifting up.

STEP 45

• If after completing previous step, the HEAD PLATE (72) still does

not sit on top of the first WEIGHT PLATE (105) or if there is
excess slack in the cable system, adjust the two threaded ends of
the HEAD PLATE CABLE (102) accordingly and retighten the jam
nuts.

• If there is excess slack in the AB or PEC DEC cable system, adjust

the threaded end of the AB CABLE (103) accordingly and re-
tighten the jam nut.

38

72

75

105

102

FIGURE 45

STEP 46

Apply pressure to the bottom of one SHROUD (31) where thw “V” groove is and carefuly remove the weight stack opening on the plastic

SHROUD (31) as shown in FIGURE 46. This will be the front SHROUD (31).

FIGURE 46

Apply one PARABODY 425

SERIOUS STEEL

LABEL (32) to the front SHROUD (31) approximately 2” from the top as shown in FIGURE

46.

32

31

31

2”

Advertising