Balance refrigerant of the 2-way, 3-way valves – Panasonic CU-C12DKU User Manual

Page 49

Advertising
background image

(Lack of refrigerant in the refrigeration cycle)

Procedure:
1. Confirm that both the 2-way and 3-way valves are set to

the open position.

2. Connect the charge set to the 3-way valve’s service

port.

•

Leave the valve on the charge set closed.

•

Connect the charge hose with the push-pin to the
service port.

3. Connect the charge set’s centre hose to refrigerant

reclaiming equipment.

•

Purge the air from charge hose.

4. Open the valve (Low side) on the charge set and

discharge the refrigerant until the gauge indicates 7.25
PSI (0.5 kg/cm

2

G) to 14.5 PSI (1 kg/cm

2

G).

•

If there is no air in the refrigeration cycle (the pressure
when the air conditioner is not running is higher than 0.1
PSI (1 kg/cm

2

G), discharge the refrigerant until the

gauge indicates 7.25 PSI (0.5 km/cm

2

G) to 14.5 PSI (1

kg/cm

2

G). If this is the case, it will not be necessary to

apply a evacuation.

•

Discharge the refrigerant gradually; if it is discharged
too suddenly, the refrigeration oil will also be
discharged.

5. Turn on refrigerant reclaiming equipment.

11.4. Balance refrigerant of the 2-way, 3-way valves

49

CS-C9DKU CU-C9DKU / CS-C12DKU CU-C12DKU

Advertising
This manual is related to the following products: