Site preparation, Required materials provided by customer – Polycom SpectraLink 6100 MCU User Manual

Page 15

Advertising
background image

3

Site Preparation

Required Materials Provided by Customer

The following equipment must be provided by the customer:

†

Outlet Strip

Recommended for installations with more than one

MCU. This will allow the MCUs to be turned on and off together.

†

Cross-Connect Block

Required to connect the telephone switch

ports and the Base Stations to the MCU.

†

25 Pair Cables

RJ-21 male at MCU end, required to connect the

MCU to the cross-connect blocks.

†

Backboard Space

The MCU is designed to be wall mounted to

3/4” plywood securely screwed to the wall.

†

Quick Clip Fuse

Required with an RCO410 Outdoor Base Station

or when a Base Station is located in a separate building from the
SpectraLink 6100 MCU. Recommended Quick Clip Fuse is
available from Illinois Tool Works, Linx Division, Model # SCP-
2X2.

†

Base Station Mounting Hardware

If the Base Stations will be

mounted on finished walls or ceilings, a 4 to 5” long 1/4” bolt,
nuts, and washers will be required for each Base Station mounted.

PN: 1725-36097-001_G.doc

15

Advertising