Precor RBK 815 User Manual

Page 20

Advertising
background image

18

Assembling and Maintaining the RBK 815 Recumbent Exercise Bike

7.

Slide the support into position so that its screw holes line

up with the corresponding holes on the body assembly, as
shown in the following illustration.

Note: If the support is positioned correctly, it rests on a
metal tab in the upright support channel.

Figure 7: Upright support insertion

Important: In the following step, be extremely careful not to
trap or pinch any of the cables between the mounting screws
and their seats.

Advertising