Installation / initial set-up, Unpacking & delivery inspection, Planning the power load – North Star M165957K User Manual

Page 12

Advertising
background image

Installation / Initial Set-Up

12

There are a number of important steps required to set up your generator for initial use. These
steps are:

Steps for Installation / Initial Set-Up

1. Unpacking & delivery inspection.

2. Planning the power load to stay within the generator’s rated

capacity.

3. Setting up generator for the type of power generation you need:

a. portable power source, or

b. connected to a building as a back-up power source.

4. Selecting a site for using the generator.

5. Grounding.

6. Battery installation (electric start models only).


Each of these steps is discussed in detail below:


1. Unpacking & Delivery Inspection

You should inspect the generator immediately after you receive delivery.

See the “Machine Component Identification” section of this manual for a
diagram of the generator and its components.

• If you have missing components, contact Product Support at 1-800-270-0810.
• If you have damaged components, contact the freight company that delivered the unit and file a

claim.



2. Planning the Power Load

Plan your power load so that you do not exceed the generator’s rated capacity.

See the “Power Load Planning & Management” section of this manual to review how to plan and
manage power loads for the generator.

Advertising