Section 3 installation, 1 unpacking and inspection, 2 planning the installation – Network Computing Devices JRC 1500 MKII User Manual

Page 14: Installation

Advertising
background image

7

SECTION 3

This section provides practical guidelines to assist in the planning and installa-

tion of the RADAR 1500 MK

2.

3.1

UNPACKING AND INSPECTION

Use care when unpacking the RADAR 1500 MK

2 from the shipping carton to

prevent damage to the contents. It is also good practice to save the carton and

the interior packing material until the radar has been satisfactorily installed.

The original packing material should be used in the unlikely event that it is

necessary to return the unit for service.

3.2

PLANNING THE INSTALLATION

The layout for installing the RADAR 1500 MK

2 should be planned to give

the best operation and service aboard your particular vessel. In general, the

scanner unit should be mounted as high as possible above the waterline and the

display unit should be installed in a convenient viewing position near the helm.

Keep in mind the optimum viewing angle when installing the display. You may

wish to apply power before finally installing the unit so that you can determine

a satisfactory viewing angle.

A 15 meter length of interunit cable is supplied for connecting the two main

units (scanner and display). This length should be sufficient to complete the

cable run required on most small vessels. It is, however, recommended that the

maximum length of interunit cable does not exceed 20 meters.

A general system diagram for the RADAR 1500 MK

2 is shown on the follow-

ing page. (See FIG. 3-1)

INSTALLATION

INSTALLATION