2 installation, 1 general, 2 mounting – NorthStar Navigation Class B Transceiver NAIS-300 User Manual

Page 7: 2 panel mounting, Mounting

Advertising
background image

Installation 7

2 Installation

2.1 General

The NAIS-00 is designed to be mounted on a flat surface

somewhere out of sight, but easily accessible. However,

to determine the best possible location, you need to

consider how and where, you are going to run the cabling

from the sides of the unit.

The NAIS-00 is very simple to install, however, the

performance of the equipment is directly affected by the

quality of the installation. Please read these instructions

carefully before attempting installation. If in any doubt,

consult a qualified marine electronics engineer.

2.2 Mounting

The transceiver requires a flat surface with a minimum

area of at least 10mm x 10mm (8.in x 5.1in) for

mounting, with an overall area of 10mm x 50mm (8.6in

x 9.8in) to allow for cables.

The surface should be rigid and sturdy enough to be able

to support the weight of the unit, taking into account the

shock loads likely to be encountered when the vessel is

under way in heavy seas.

Hold the unit against the surface where it is to be
mounted, and mark the position of the four holes
with a pencil.

Drill a .7mm (.145in) hole on each corner mark.
Align the holes on the NAIS-00 with those you
have just drilled, and fasten with the 4 - No.8 x /4
self tapping screws supplied.

1

2
3

Advertising