System checkout checking installation – Nordyne E3 Series User Manual

Page 21

Advertising
background image

21

SYSTEM CHECKOUT

Checking Installation

1. Refer to appropriate wiring diagram and

recheck all wiring connections. Ensure that
all connections are tight.

2.

Check blower motor and relay box con-
nectors for proper connection.

3. Reinstall control box cover(s).
4. Switch circuit breaker(s) to “ON” position.
5. Set furnace blower selector switch (see

Figure 16) to “AUTO” (EH Units only).

6. Replace outer furnace door.
7.

Check all duct connections and tape for air
leakage.

Table 6. Blower Performance

Table 7. Anticipator Settings

Table 8. Clearances

Standard E3EH Blower
with Filter, @ 0.3" ESP

Pin No.

Speed

CFM

#1

Low

840

#2

High

1160

4-Ton Blower with Coil and
Coil and Filters, @ 0.3" ESP

Pin No.

Speed

CFM

#1

Low

880

#2

Med.-Low

1170

#3

Med.-High

1310

#4

High

1460

5-Ton Blower, with Coil and
Coil Filters, @ 0.3" ESP

Pin No.

Speed

CFM

#1

Low

990

#2

Med.-Low

1320

#3

Med.-High

1620

#4

High

1790

Multi-Speed, X13, Blower, with
Coil and Filters, @ 0.3" ESP

Pin No.

Speed

CFM

#1

Low

880

#2

Med.-Low

1000

#3

Med

1170

#4

Med.-High

1260

#5

High

1460

Furnace

Model

Thermostat

Anticipator Setting

010, 012

0.2

015, 017, 020, 023

0.4

ALL MODELS

CLOSET ALCOVE

Front **

6"

18"

Back

0"

0"

Sides

0" *

0" *

Top

0"

0"

Top and Sides of Duct

0"

0"

Bottom of Duct

0"

0"

** Service Clearance
* For upfl ow application using upfl ow stand, 1” minimum per

side.

Advertising
This manual is related to the following products: