Quick-start guide – Northern Industrial Tools Item# 145765 User Manual

Page 2

Advertising
background image

Quick-Start Guide

ATTENTION: READ AND FOLLOW UNPACKING & ASSEMBLY GUIDE BEFORE
OPERATION.

1. Front Locking Bolt 5. Front Wheels

2. Band Saw

.

6. Rear Wheels

3. Locking device between saw arch and table

.

7. Length-restricting device for workpiece

4. Rear Locking Bolt

UNPACKING

Step 1.

Snip the carton wrapping belt near the wooden pallet, pull the nails from the

carton and pallet, then the carton can be taken away.

Step 2.

The band saw can be removed from the pallet by removing the bolts and

connecting parts (1 & 4 of Fig. A). Remove the bolt and connecting parts of the locking
device (3 of Fig. A), then the saw arch can be raised.

ASSEMBLY

Step 1.

Assemble the front & rear wheels (5 & 6 of Fig. B).

Step 2.

By removing the locking device (3 of Fig. A), the saw arch could be raised. The

saw arch will stay in position if the hydraulic valve (A & B of Fig. B) is “Off”. The saw
arch cannot be pressed down by using external force. You must put the hydraulic valve
(A of Fig. B) in “On” position and then switch the flow control (B of Fig. B) to lower the
saw arch. The speed of the saw arch going down depends on the range you choose for
the flow control valve (B of Fig. B).

Note:

The hydraulic valve (A of Fig. B) is “Off” when its handle is in horizontal direction,

and “On” when its handle is vertical.

Page 1 of 15

Advertising