Floor-standing installation equipment, Table 8-2 – NEC NEAX 2000 IPS User Manual
Page 92

NEAX 2000 IPS Configuration Guide
Page 82
NDA-24347, Issue 1
Floor-standing Installation Equipment Chapter 8 System Capacity
Floor-standing Installation Equipment
Note:
The number of PWR CA and BATT CA are determined by the location of battery installed (inside or outside
of PIM). As for the BATT CA, it is also required to select the appropriate type. If battery backup is not
needed, these cables are not required.
Table 8-2 Required Common Equipment for Floor-standing Installation
NO. ITEM DESCRIPTION
QTY
1 PIM 2 PIM 3 PIM 4 PIM 5 PIM 6 PIM 7 PIM 8 PIM
1
PIM PIMMD
1 2 3 4 5 6 7 8
2
TOP/BASE TOP/BASE
1 1 1 1 2 2 2 2
3
BRACKET
MOUNTING BRACKET
(Optional)
0 0 0 1 1 1 1 2
4
BASE TRAY
BASE TRAY ASSEM
(Optional)
1 1 1 1 2 2 2 2
5
PWR CA
PWR CA-A
INTERNAL
BATT
0 (1) (1) (2) (2) (3) (3) (4)
EXTERNAL
BATT
0 (1) (2) (3) (3) (4) (5) (6)
6
BATT CA
BATT CA INT
(for Internal BATT)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
BATT CA EXT
(for External BATT)
(1)
(1)
(1)
(1)
(2)
(2)
(2)
(2)
7
MP
Refer to the Equipment List
1
1
1
1
1
1
1
1
8
FP/BUS
PN-CP15
0
0
1
1
2
2
3
3
9
BUS CABLE
48-TW-0.7 CONN CA
0
1
2
3
4
5
6
7