Step 4, Step 5 – North Star 165959 User Manual

Page 5

Advertising
background image

5

STEP 4

• Assemble Tongue Arm to Base with (2) 1/2-13 X 1.25” hex head bolts, (4) 1/2 Flat Washers, and (2) 1/2-13

Ny-Loc Nuts. Assemble Tongue to Tongue Arm with (2) 1/2-13 X 1.25 Carriage bolts, (2) 1/2 flat washers,
and (2) 1/2-13 Ny-Loc nuts. Note: The Tongue Arm and Tongue is adjustable to fit many different PTO
Generators and PTO Implement Shafts. You may need to adjust the Tongue to fit your implement shaft. The
Tongue Arm pivots and is adjustable to fit different PTO Generators, if you have a NorthStar PTO Generator
use the center hole.

00675

STEP 5

• Assembly wheels to hubs with the 10 lug bolts.

00676

Advertising