Nortec Industries NHRS Series User Manual

Page 13

Advertising
background image


10-10

Page 4

2008-02-18

3. ELECTRICAL

(1)

Humidifiers require field wiring to the primary voltage terminal block. Power and
fusing requirements are as indicated on the Specification label. Wiring is fed
through an electrical knockout in the bottom back of the electrical cabinet.

4. CLEARANCES

(1)

The clearance dimensions shown in the manual are for reference only and are the
minimum requirements for maintenance of the humidifier.

5. WATER REQUIREMENTS

(1)

The NHRS will operate properly on all potable water sources. De-mineralized
water supplies such as Reverse Osmosis and De-Ionized water will reduce
maintenance intervals significantly.

6. STEAM DISTRIBUTION AND ABSORPTION

(1)

The NHRS can be used with stainless steel distributors or SAM-e manifolds for
short absorption distance.

(2)

The distance between the humidifier and the steam distribution system should not
exceed 15 feet for accurate humidity control.

(3)

Refer to the Steam Distribution Engineering Manual (Form #XX-232) or the
H.E.L.P. software.

Advertising