Seal humidifier dispersion-tube duct penetrations with flange.
(c)
Install with required clearance for service and maintenance.
3. TESTING
(a)
System verification testing is part of the commissioning process. Verification 
testing shall be performed by the Contractor and witnessed and documented 
by the Commissioning Authority. Refer to section 01810, Commissioning, for 
system verification tests and commissioning requirements. 
XXXXX OR XXXXX
(b)
Manufacturer’s Field Service: Engage a factory-authorized service 
representative to inspect field-assembled components and equipment 
installation, including piping and electrical connections. Report results in 
writing. 
(i)
Leak Test: After installation, charge system and test for leaks. Repair 
leaks and retest until no leaks exist. 
(ii)
Operational Test: After electrical circuitry has been energized, start 
units to confirm proper unit operation. Remove malfunctioning units, 
replace with new units, and retest. 
(iii) Test and adjust controls and safeties. Replace damaged and
malfunctioning controls and equipment.
3. TRAINING
(a)
Training of the Owner’s operation and maintenance personnel is required in 
cooperation with the Commissioning Authority. Provide competent, factory 
authorized personnel to provide instruction to operation and maintenance 
personnel concerning the location, operation, and troubleshooting of the 
installed systems. The instruction shall be scheduled in coordination with the 
Commissioning Authority after submission and approval of formal training 
plans. Refer to System Demonstrations, section 01670, for contractor 
training requirements. 
XXXXX OR XXXXX
(b)
Engage a factory-authorized service representative to train Owner’s 
maintenance personnel to adjust, operate, and maintain humidifiers. 
(i)
Train Owner’s maintenance personnel on procedures and schedules for 
starting and stopping, troubleshooting, servicing, and maintaining 
equipment and schedules. 
(ii)
Review data in maintenance manuals. Refer to Division 1 Section 
“Contract Closeout.” 
(iii) Review data in maintenance manuals. Refer to Division 1 Section
“Operation and Maintenance Data.”
(iv) Schedule training with Owner, through Architect, with at least seven
days advance notice.