Humidifiers – Nortec Industries NHRS Series User Manual
Page 19
 
10-20
Page 2
2008-02-18
1. HUMIDIFIERS
A. GENERAL
(1) Work
Included
(a)
NORTEC NHRS Resistive Element steam humidifier[s] as indicated on 
drawing[s] and as indicated on schedule[s]. 
(b)
Complete and operable humidification system [which meets applicable 
building codes]. 
(c)
Equipment start-up and project inspection by qualified factory trained 
representative. 
(2) Quality
Assurance
(a)
Manufacturer: For each product specified, provide components by same 
manufacturer throughout. 
(b)
Electrical Components, Devices, and Accessories: Listed and labeled as 
defined in NFPA 70, Article 100, by a testing agency acceptable to authority 
having jurisdiction, and marked for intended use. 
(c)
Comply with ARI 640, “Standard for Commercial and Industrial Humidifiers.”
(d)
Products shall be supported with a warranty that ensures the product will be 
free from defects in materials and workmanship for a period of two years after 
shipment. 
(e)
Commissioning of a system or systems specified in this section is part of the 
construction process. Documentation and testing of these systems, as well 
as training of the Owner’s operation and maintenance personnel, is required 
in cooperation with the Commissioning Authority. Project Closeout is 
dependent on successful completion of all commissioning procedures, 
documentation, and issue closure. Refer to Project Closeout, Section 01700, 
for substantial completion details. Refer to Section 01810, Commissioning, 
for detailed commissioning requirements. 
(f)
Products specified below are to be manufactured is an ISO 9001-2000 
certified facility. 
(3) Submittals
(a)
Submit product data under provisions of Section 15010. Include product 
description, model, dimensions, component sizes, rough-in requirements, 
service sizes, and finishes. Include rated capacities, operating weights, 
furnished specialties, and accessories. 
(b)
Submit manufacturer’s installation instructions.
(c)
Submit operation and maintenance data.
(d)
Submit coordination drawings. Detail fabrication and installation of 
humidifiers. Include piping details, plans, elevations, sections, details of 
components, and dispersion tubes. Detail humidifiers and adjacent 
equipment. Show support locations, type of support, weight on each support, 
and required clearances. 
(e)
Submit wiring diagrams including power, signal, and control wiring. 
Differentiate between manufacturer-installed and field-installed wiring. 
(f)
Submit minimum water quality requirements and water pressure 
requirements.