Verifying installation – Nextel comm IR1200 User Manual

Page 45

Advertising
background image

Verifying Installation

RFM-4200-5015 Rev1

37

Verifying Installation

In this chapter, you will learn how to verify that the installation of the iR1200

modem was successful.

This chapter includes:

Powering up the Modem

Vehicle Installation
Stationary Installation

Page 37
Page 37
Page 38

Communication Indicators

Page 38

Powering Up the Modem

Once you have completed the installation of the modem’s hardware

components and connected all the power cables, power up the modem to ensure

that the installation was successful.

Powering Up – Vehicle Installation

The following table contains the steps for powering up the modem for a vehicle

installation:

1 Turn on the vehicle’s ignition.
2 The STATUS LED light will initially blink Red. This

indicates that the modem is searching for a signal within the

Nextel network.

3 A blinking Green light indicates that a signal has been found

and the modem was successful in making a connection.

4 The STATUS LED should blink Green within 3 minutes

from the time the vehicle’s ignition was turned ON.

Advertising