Before you start – Nortel Networks FastRad User Manual

Page 13

Advertising
background image

3

FastRAD Installation Guide

Before you
start

Make sure you read and follow the instructions in this
guide.

Make sure you have the necessary tools to complete the
installation. A Special parts check list is provided in this
guide.

Make sure all equipment in the FastRAD package is
accounted for. A Package check list is provided in this
guide.

Make sure the necessary environment and electrical con-
ditions are met. An Environment check list and list of
Electrical requirements are provided in this guide.

Important

: Only one FastRAD can be connected to a KSU.

Environment
check list

The FastRAD installation area should be:

clean, free of dust, dry and well ventilated

between 0

°

and 50

°

Celsius (32

°

to 122

°

Fahrenheit)

non-condensing relative humidity between 5% and 95%

within 800 m (2600 feet) of the Norstar KSU

Note

: When using a Norstar 3X8 KSU the FastRAD must be

installed within 305 m (1000 feet).

free of Bridge taps on the FastRAD KSU TCM loop

free of Loading coils on the FastRAD KSU TCM loop

Package check
list

Make sure the package contains:

the Norstar FastRAD

an RJ-11 teladapt cord

a power supply with a barrel connector

a paper template (for mounting)

855601 Book : 855601 Guide Page 3 Wednesday, October 29, 1997 4:06 PM

Advertising