Ups/400 – Nikon UPS User Manual

Page 21

Advertising
background image

UPS/400

. . . an IBM AS/400 UPS power monitoring system . . .

21

• BSCW: The job is waiting for the completion of an I/O operation to a binary synchronous

device.

• CMNA: The job is waiting for the completion of an I/O operation to a communications device in

the activity level.

• CMNW: The job is waiting for the completion of an I/O operation to a communications device.

• CMTW: The job is waiting for the completion of save-while-active checkpoint processing in

another job. This wait is necessary to prevent a partial commitment control transaction from
being saved to the media.

• CPCW: The job is waiting for the completion of a CPI Communications call.

• DEQA: The job is waiting for completion of a dequeue operation in the pool activity level.

• DEQW: The job is waiting for completion of a dequeue operation. For example, QSYSARB and

subsystem monitors generally wait for work by waiting for a dequeue operation.

• DKTA: The job is waiting for the completion of an I/O operation to a diskette device in the

activity level.

• DKTW: The job is waiting for the completion of an I/O operation to a diskette device.

• DLYW: Due to the Delay Job (DLYJOB) command, the job is delayed waiting for a time interval

to end, or for a specific delay end time. The function field shows either the number of seconds
the job is to delay (999999), or the specific time when the job is to resume running.

• DSC: The job has been disconnected from a work station display.

• DSPA: The job is waiting for input from a work station display in the activity level.

• DSPW: The job is waiting for input from a work station display.

• END: The job has been ended with the *IMMED option, or delay time has ended with the

*CNTRLD option.

• EOFA: The job is waiting in the activity level to try a read operation again on a database file

after the end-of-file has been reached.

• EOFW: The job is waiting to try a read operation again on a database file after the end-of-file

has been reached.

• EOJ: The job is ending for a reason other than End Job (ENDJOB) or End Subsystem

(ENDSBS). For example, SIGNOFF, End Group Job (ENDGRPJOB), or an exception that is
not being handled.

• EVTW: The job is waiting for an event. For example, QLUS and SCPF generally wait for work

by waiting for an event.

• GRP: The job is suspended due to a Transfer to Group Job (TFRGRPJOB) command.

• HLD: The job is being held.

• ICFA: The job is waiting, in an activity level, for the completion of an I/O operation to an

intersystem communications function file.

• ICFW: The job is waiting for the completion of an I/O operation to an intersystem

communications function file.

• INEL: The job is ineligible and not currently in the pool activity level.

• LCKW: The job is waiting for a lock.

• MLTA: The job is waiting, in an activity level, for the completion of an I/O operation to multiple

files.

• MLTW: The job is waiting for the completion of an I/O operation to multiple files.

• MSGW: The job is waiting for a message from a message queue.

• MTXW: The job is in a mutex wait. A mutex is a synchronization function that is used to allow

multiple jobs or processes to serialize their access to shared data.

• MXDW: The job is waiting for the completion of an I/O operation to a mixed device file. Details

are in the Remote Work Station Support book.

• OPTW: The job is waiting for the completion of an I/O operation to an optical device.

• OSIW: The job is waiting for the completion of an OSI Communications Subsystem/400

OSLISN, OSRACS, OSRACA, OSRCV, or OSRCVA operation.

• PRTA: The job is waiting for output to a printer to complete in the activity level.

• PRTW: The job is waiting for output to a printer to be completed.

• PSRW: The job is a prestart job waiting for a program start request.

• RUN: The job is currently running in the activity level.

Advertising