1. INSTALLATION

A. NOZZLE SYSTEM LAYOUT

(1)

If a drawing for the proposed system was not supplied, then it is recommended that
one be created prior to installing the system. With reference to the AIRFOG
Engineering Manual, review the site where the nozzle system is to be installed.
The location of equipment, lights, pillars and other structures should be drawn on
the floor plans. The proper selection and location of the nozzles is very dependent
upon these obstructions. Figure 1 Typical Nozzle Layout, can be used as a guide
for identifying the various components used with a system.

(2) The supply and feed lines for the system should be kept in straight unobstructed

lines where possible. Air and water distribution network pipes are to be
installed level along walls, pillars or hung from the ceiling. Avoid placing the
lines over top of equipment and other areas, which will make it difficult to gain
access at a later date. If the lines have to be routed around an obstacle such
as a beam, always go under the obstacle, never over it.