Loading from a bank, Operation, Opera t ion – Rhino Mounts 1594 User Manual

Page 74

Advertising
background image

OPERATION

1594 01/11

Operation Section 4-30

© 2011 Alamo Group Inc.

OPERA

T

ION

LOADING FROM A BANK

Choose a forward gear that provides sufficient
ground speed for loading.

Exercise caution when undercutting high banks.
Dirt slides can be dangerous. Load from as low
as possible for maximum efficiency. Loader lift
and breakaway capacity diminish as loading
height is increased.

Side cutting is a good technique for cutting down
a big pile.

If the pile sides are too high and liable to cause
cave-in, use loader to break down the sides until
a slot can be cut over the top.

Advertising