Backfilling, Operation, Opera t ion – Rhino Mounts 1594 User Manual

Page 78

Advertising
background image

OPERATION

1594 01/11

Operation Section 4-34

© 2011 Alamo Group Inc.

OPERA

T

ION

BACKFILLING

Poor methods actually move no more dirt and
make it more difficult to hold a level grade.

Do not use bucket in dumped position for
bulldozing. This method, shown above, will
impose severe shock loadings on dump linkage,
bucket cylinder and tractor.

Advertising