Installation and setup, Chapter 2 installation and setup – RAD Data comm ASM-10/8 User Manual

Page 25

Advertising
background image

09/10/00 16:26

Package Contents

2-1

Chapter 2
Installation and Setup

This chapter provides the following information for the ASM-10/8
standalone model:

Site requirements and prerequisites

Package contents

Instructions for mechanical installation

Instructions for electrical installation.

After installing the unit, refer to Chapter 3 to assure normal operation.
In case a problem encountered, refer to Chapter 4 for test and diagnostic
instructions.

2.1 Site Requirements and Prerequisites

Power

ASM-10/8 should be installed within 1.5m (5 ft) of an easily accessible
grounded AC outlet. The outlet should furnish 100-115 VAC or 230 VAC.

Allow at least 90 cm (36 in) of clearance at the front for operating and
maintenance accessibility.

Allow at least 10 cm (4 in) clearance at the rear of the unit for signal lines
and interface cables.

Ambient
Requirements

The ambient operating temperature of ASM-10/8 is 0 to 50°C (32 to 122°F)
at relative humidity of 90%, non-condensing.

2.2 Package Contents

The ASM-10/8 includes the following items:

One ASM 10/8 unit (protected by adequate cushioning)

AC power cord

ASM 10/8 Installation and Operation Manual.

Advertising