Package Contents

2-1

Chapter 2
Installation and Setup

This chapter provides the following information for the ASM-10/8
standalone model:

•

Site requirements and prerequisites

•

Package contents

•

Instructions for mechanical installation

•

Instructions for electrical installation.

After installing the unit, refer to Chapter 3 to assure normal operation.
In case a problem encountered, refer to Chapter 4 for test and diagnostic
instructions.

2.1 Site Requirements and Prerequisites

Power

ASM-10/8 should be installed within 1.5m (5 ft) of an easily accessible
grounded AC outlet. The outlet should furnish 100-115 VAC or 230 VAC.

•

Allow at least 90 cm (36 in) of clearance at the front for operating and
maintenance accessibility.

•

Allow at least 10 cm (4 in) clearance at the rear of the unit for signal lines
and interface cables.

Ambient
Requirements

The ambient operating temperature of ASM-10/8 is 0 to 50°C (32 to 122°F)
at relative humidity of 90%, non-condensing.

2.2 Package Contents

The ASM-10/8 includes the following items:

•

One ASM 10/8 unit (protected by adequate cushioning)

•

AC power cord

•

ASM 10/8 Installation and Operation Manual.