Repacking, 5 packing the fibre channel option, Packing the fibre channel option -6 – Qualstar 501440 Rev. G User Manual

Page 81

Advertising
background image

AC Power Receptacle

Power Switch

SCSI 1

SCSI 2

Fibre Channel

Port 2

Fibre Channel

Port 1

Ethernet

Serial Port

Ready/Fault LED

Reset Switch

FC Activity LED

FC Link LCD

SCSI Activity

Port 2 LED

SCSI Activity

Port 1 LED

Figure 9-6 Rear View of the ATTO Fibre Channel Bridge/Router (FCO)

1.

Remove power from the FCO: first turn the power switch off and then remove the
power cord.

2.

Remove power from the TLS: first turn the power switch off and then remove the
power cord.

3.

If the FCO is connected the FC host or Hub, disconnect it.

4.

Disconnect any SCSI cables (SCSI 1 and SCSI 2) from the rear of the FCO.

5.

Disconnect the cable from the serial port or Ethernet connectors on the FCO, if
connected.

6.

If the FCO is mounted in a rack, cabinet or other location detach it and it will be
ready for packing.

9.5

Packing the Fibre Channel Option

1.

Using the packing material that came with the FCO, place the FCO into the
shipping carton and seal with shipping tape.

9-6

501440 Rev. J

Repacking

Advertising