Unit Shutdown Procedures

Daily Unit Shutdown

Note: Refer to Start-Run Shutdown
sequence in General Information
Overview Sequence of Operation.

1. Press STOP.

2. After compressor and water

pumps shutdown turn Pump
Contactors to OFF or open pump
disconnects.

Seasonal Unit Shutdown

CAUTION

Oil Pump Heater
Operation!

CONTROL POWER DISCONNECT
SWITCH MUST REMAIN CLOSED TO
ALLOW OIL SUMP HEATER
OPERATION. Failure to do this will
allow refrigerant to condense in the
oil pump.

3. Open all disconnect switches

except the control power
disconnect switch.

4. Drain the condenser piping and

cooling tower, if used. Rinse with
clean water.

5. Remove the drain and vent plugs

from the condenser headers to
drain the condenser. Air dry bundle
of residual water.

6. Once the unit is secured for winter,

the maintenance procedures
described under “Annual
Maintenance” in the Periodic
Maintenance section of this

manual should be performed by
qualified Trane service technicians.

Note: During extended shutdown, be
sure to operate the purge unit for a 2-
hour period every two weeks. This
will prevent the accumulation of air
and noncompensable in the
machine. To start the purge, change
the purge mode to ON in the
DynaView

Settings Purge Menu.

Remember to turn the purge mode to
Adaptive after the 2-hour run time.

Trouble Analysis

If the ALARM indicator on the control
panel is flashing, an MMR diagnostic
has occurred. Refer to Diagnostic
section for trouble shooting
information. (page 35)