Steamer operation – Top Innovations SP-350 User Manual

Page 7

Advertising
background image

STEAMER OPERATION

A.

Set the unit on the floor and remove the water

container.

B.

Check the inside of the container the sediment. If

present rinse the container and following the
Removing Mineral Buildup procedure f o u n d later in
this manual.

C.

Turn the container upside down and push the plunger
valve open and allow to close two or three times to
insure it is functioning smoothly.

CAUTION: DO NOT PULL ON THE PLUNGER

VALVE OR YOU MAY ACCIDENTALLY REMOVE

IT AND THE WATER TANK W

I

LL NOT FUNCTION

PROPERLY.

D.

If the plunger is removed or falls out of the from the

valve cap assembly please refer to the Reassembling

The Water Tank Valve Cap procedure later in this

manual.

STEP 2- FILLING THE WATER CONTAINER

NOTE: USE OF DEMATERIALIZED OR DISTILLED
WATER IS HIGHLY RECOMMENDED.

A.

Insure the unit is unplugged.

B.

Remove the water container with the handle

and

turn

upside dow

n.

C.

Turn the water facet in

you sink

o n

to a mild stream

D. While depressing the valve in the center of the base,

fill the tank with cool water through the opening.

NOTE: DO NOT FILL THE CONTAINER WITH HOT
WATER.

E.

Release the valve and install water tank

o n

the base.

STEP 3 -OPERATING THE STEAMER

A.

Ensure the ON/OFF switch is in the OFF position.

B .

Plug the steamer cord into

a

normal

electrical

outlet or approved extension cord.

C .

Turn the ON/OFF switch to the O N position.

D.

The switch will light when electricity is connected.

E.

Steam will be produced from the nozzle in a few

seconds.

CAUTION: DO NOT ALLOW THE CONTAINER TO
BECOME DRY DURING OPERATION, AS THIS W

I

LL

SHORTEN THE LIFE OF THE STEAMER.

STEP 1 - PREPARATION FOR USE

P.6

Advertising