Operation – Trane GHND-SVX01A-EN User Manual
Page 32
 
32
High Efficiency Propeller Fan Gas Unit Heater •
GHND-SVX01A-EN
Operation
Notes:
This schedule is for units operating at normal altitudes of 2000 ft. (610m) or less. SPECIAL ORIFICES ARE
REQUIRED FOR INSTALLATIONS ABOVE 2,000 FT. (610M).
Notes:
When installed in Canada, any references to deration at altitudes in excess of 2000 feet (610m) are to be
ignored. At altitudes of 2000 to 4500 feet (610 to 1372m), the unit heaters must be orificed to 90% of
the normal altitude rating, and be so marked in accordance with the CSA certification.
Table 6.
Main burner orifice schedule
Input in 1000 BTU
Type of Gas
Natural
Propane
Number of 
Burner 
Orifices
Heating Value
1075 BTU/Ft3
(40.1 MJ/m3)
2500 BTU/Ft3
(93.1 MJ/m3)
Manifold Pressure
3.5" W.C.
(0.87kPA)
10" W.C.
(2.49 kPA)
30
FT 3/HR
ORIFICE DRILL
28 
49
12 
57
2
45
FT 3/HR
ORIFICE DRILL
42 
49
16 
57
3
60
FT 3/HR
ORIFICE DRILL
56 
49
24 
57
4
75
FT 3/HR
ORIFICE DRILL
70 
49
30 
57
5
100
FT 3/HR
ORIFICE DRILL
96 
42
40 
54
4
125
FT 3/HR
ORIFICE DRILL
120 
42
50 
54
5
150
FT 3/HR
ORIFICE DRILL
140 
42
60 
54
6
175
FT 3/HR
ORIFICE DRILL
163 
42
70 
54
7
200
FT 3/HR
ORIFICE DRILL
186 
42
80
54
8
225
FT 3/HR
ORIFICE DRILL
210 
42
90 
54
9
250
FT 3/HR
ORIFICE DRILL
233 
42
100 
54
10
300
FT 3/HR
ORIFICE DRILL
280 
42
120 
54
12
350
FT 3/HR
ORIFICE DRILL
326 
42
140 
54
14
400
FT 3/HR
ORIFICE DRILL
372 
42
160 
54
16